Tampa Bay Water - Cross Bar Ranch
Wellfield Pump Replacement Project

This project included field observations and findings plus recommendations related to the electrical systems for the 17 well sites, including the following:

 

  • Electric rating of new motor control center (MCC)

  • Characteristics of new panelboard for miscellaneous 120 volt lighting

  • Characteristics of new reduced voltage soft-starter for pump control

  • Features of new electronic multifunction power meter

  • Transient voltage surge protection for new MCC.

  • Interconnection between new MCC and existing SCADA RTU

  • Provide opinion of preliminary construction cost

 

Planning, Design and Engineering support of electrical power distribution systems 