City of Pompano Beach Water Treatment Lime Softening Plant
Electrical Improvements Master Plan Phase II
Designed two (1) 5 KV/480 V substation transformer, new switchboards that supply power to VFDs for the speed control of 150 hp pumps, including manholes and stainless steel boxes for 5 kV cables, conduits, power for air conditioning equipment and new lighting system, and interconnection with existing PLC and SCADA system
Performed Design, calculations, edited drawings & specifications. Additional services included construction support and assistance to Owner for review of equipment shop drawings, review of protective coordination and arc-flash studies. Inspection of Construction Work.