City of Pompano Beach Water Treatment Lime Softening Plant
Electrical Improvements Master Plan Phase I
This project included the design and construction to replace 5 kV power distribution switchgear, synchronizing switchgear and controls of two 900 kW – 5 kV standby power generators, 5 kV motor control centers, 600 volts power distribution switchgear, 5 kV /480 volts transformers, supervision for design of 600 hp pump’s speed controls with 5 kV VFDs and addition of programmable logic controllers.